木马上凸起电动木棒视频播放_国产卡一卡二卡三高清_在线观看三级国产精品_美国免费三片在线观看

Shagang hot tests CISDI’s latest mould hydraulic oscillation control system

Date:2025/1/14 Source: CISDI

The modernised mould’s hydraulic oscillation control system leads the sector and enhances strand’s surface quality - and a new-generation system has now been designed by CISDI.

It has been hot tested at Shagang’s slab caster 5 in China’s Jiangsu Province and multiple breakthroughs in the system’s critical control algorithm and its control strategy have been achieved.

They include:

Compound feedforward and gain controls;

Oscillating parameters self-adaptation;

Interference-proof positioning.

These breakthroughs solve control instability issues caused by unknown load interference and enhance dual-cylinder synchronous control precision and systematic robustness.

Plug and Play technology meant it took only 24 hours for commissioning and on-line connection. This convenient method also makes future modification much easier.

Additionally, stable and uninterrupted operation of the continuous caster has been ensured. Previously, the mould’s abnormal stagnation interrupted procedures and forced stoppage.

CISDI’s teamwork and professionalism played a strong supportive role in the hot testing, from proposals to electric diagram designs, equipment supplies and commissioning.

 

 

Now in operation - the CCM 5 at Shagang, built by CISDI